Access the Full Project by Clicking here!
Bidjugde
JOB
Pavement Major Rehabilitation FY 14 15 Sewer Access Road
BID DATE
03/16/16 - 2:00
AGENCY
Chula Vista
ESTIMATE
$4,210,000
SCOPE
The scope of work consists of the pavement rehabilitation of various street pavement (STM383 & STM387) and two sewer access road locations (SW277). The work includes the removal and replacement of damaged asphalt concrete pavement, application of asphalt concrete overlay or Asphalt Rubber Aggregate Membrane (ARAM) over a 3/4-inch conventional asphalt concrete leveling course. The work also includes excavation and grading, removal and disposal of existing improvements, installation of AC pavement, weed removal and treatment with herbicide, cold milling, replacement and/or repair of curb, gutter, sidewalk, pedestrian ramps, cross-gutter, traffic control, protection and restoration of existing improvements, other miscellaneous work, and all labor, material, equipment and transportation necessary for the project.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT