Access the Full Project by Clicking here!
Bidjugde
JOB
Critical Waterline Replacements
BID DATE
10/29/26 - 9:00
AGENCY
Truth Consequences
ESTIMATE
n/a
SCOPE
The project includes the replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 116 linear feet (LF) of 4-inch, 31,508 linear feet (LF) of 6-inch, 2,812 LF of 8-inch, and 888 linear feet (LF) of 10-inch C-900 DR-18 PVC waterline. All waterline replacements will be installed parallel to the existing waterlines. The project also includes the installation of approximately 70 LF of 8-inch waterline carrier pipe within a 16-inch steel casing by jack and bore, and 60 LF of 10-inch waterline carrier pipe within an 18-inch steel casing by jack and bore, both under NMDOT roadway crossings. Additionally, approximately 208 LF of 6-inch, 129 LF of 8-inch, and 118 LF of 10-inch C-900 DR-18 FPVC waterlines will be installed by horizontal directional drilling. The scope of work includes the installation of 316 new water service connections, 310 by open trench and 6 by trenchless methods, with new water meters and meter boxes. Additional improvements include the installation of valves, fire hydrants, and connections to the existing water system. Site work will include roadway asphalt removal and replacement, as well as sidewalk, curb, gutter, and drive pad removal and replacement to facilitate trenching activities and full site restoration. https://www.bidnetdirect.com/new-mexico/solicitations/open-bids/TRUTH-OR-CONSEQUENCES-CRITICAL-WATERLINE-REPLACEMENTS/0000436153?purchasingGroupId=8406351&origin=1 cmiyagishima@torcnm.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT