Access the Full Project by Clicking here!
Bidjugde
JOB
Water System Performance Improvements 2 WSPI 2
BID DATE
11/12/26 - 9:00
AGENCY
Truth Consequences
ESTIMATE
n/a
SCOPE
The project includes the replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 112 linear feet (LF) of 4-inch, 1,216 LF of 6-inch, 4,448 LF of 8-inch, 8,565 LF of 10-inch, and 22 LF of 12-inch C-900 DR-18 PVC waterline. All waterline replacements will be installed parallel to the existing waterlines within a typical 6 foot wide by 4-foot-deep trench. The project also includes the installation of approximately 150 LF of 18-inch steel casing by jack and bore, and approximately 100 LF of 8-inch and 211 LF of 10-inch C-900 DR-18 FPVC waterlines installed by horizontal directional drilling. The scope of work includes the installation of 101 new water service connections, 66 by open trench, and 35 by HDD and new water meters. Additional improvements include the installation of valves, fire hydrants, and connections to the existing water system. Site work will include roadway asphalt removal and replacement, as well as sidewalk, curb and gutter, and drive pad removal and replacement to facilitate trenching activities and full site restoration. https://www.bidnetdirect.com/new-mexico/solicitations/open-bids/WATER-SYSTEM-PERFORMANCE-IMPROVEMENTS-2-WSPI-2/0000438162?purchasingGroupId=8406351&origin=1 cmiyagishima@torcnm.gov
PREBID
10/8/2026 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT