Construction Sidewalks Driveway Aprons Curb Ramps Clark Ave
BID DATE
02/29/16 - 11:00
AGENCY
Bellflower
ESTIMATE
$150,000
SCOPE
The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the above stated project. It is the intent of this contract to have the contractor perform the Construction of Sidewalks, Driveway Aprons, and Curb Ramps at Various Locations More information may be obtained by contacting the Project Manager, Philip Wang at pwang@bellflower.org.