Access the Full Project by Clicking here!
Bidjugde
JOB
Inner Perimeter Road Water Lines
BID DATE
10/22/26 - 1:00
AGENCY
Valdosta
ESTIMATE
n/a
SCOPE
The work consists of: Installation of approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street including 24,693 linear feet of PVC water line ranging from 12— to 20— by excavation and 7,400 linear feet of Fusible PVC water line of similar size by directional bore, 2,162 of push-on or restrained joint ductile iron water line ranging from 12— to 20—, and 1,436 linear feet of steel casing ranging from 24— to 36— by jack and bore, 28 fire hydrants complete, 22 resilient seated gate valves and valve boxes ranging from 8— to 20—, pavement removal and replacement, soil erosion and sediment control best management practices, storm water monitoring, and appurtenances Contact: smilligan@valdostacity.com. Offerors' Conference Conference Attendance Conference Date/Time Location Street City State Zip Code Show Details --> Mandatory Oct 06, 2026. eSource PE-66249-NONST-2027-000000119. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66249-NONST-2027-000000119&sourceSystemType=gpr20

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT