Access the Full Project by Clicking here!
Bidjugde
JOB
SE Eastgate Way Sidewalk
BID DATE
10/8/26 - 9:00
AGENCY
Bellevue
ESTIMATE
n/a
SCOPE
The major features of the project are as follows: • Evaluate alternative cross sections: including lane width, shoulders, bike lane, width of planters, sidewalk width, barrier, and retaining wall type. • Develop criteria and select a preferred alternative.• Develop 30%, 60%, 90%, and final design plans, specifications and cost estimates. • Complete environmental study and permitting • Provide design support during construction• Other improvements and work associated with the sidewalk include, but are not limited to, site preparation, erosion and sediment control, storm drainage system, flow control and water quality facilities, environmentally sensitive area impact mitigation, irrigation, landscaping, channelization, retaining walls, signing, traffic control, and other mitigation as required. https://www.publicpurchase.com/gems/bellevue,wa/bid/bidView?bidId=215869 KTDang@bellevuewa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT