Access the Full Project by Clicking here!
Bidjugde
JOB
Interurban Avenue S Overlay
BID DATE
09/29/26 - 2:30
AGENCY
Tukwila
ESTIMATE
$3,800,000
SCOPE
The Interurban Avenue S Overlay Project will include pavement overlay and corridor improvements from East Marginal Way S to S 143rd Street, a total distance of about 2.25 miles. Work shall include, but is not limited to: Fiber Reinforced Hot Mix Asphalt (HMA) overlay; planing bituminous pavement; pavement repairs; upgrades or replacement of traffic detection systems within the grind and overlay limits; improvements to ADA ramps and pedestrian push buttons; driveway approach improvements; and work at 9 signalized and 10 unsignalized intersections. Additional work includes providing all necessary traffic control labor and devices and other items required to complete the Work as shown in the Contract Documents. http://bxwa.com/bxwa_toc/pub/322/tuk62_interurban_avenue_s_over_47498/info.php David.Baus@tukwilawa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT