Access the Full Project by Clicking here!
Bidjugde
JOB
CLCWA Sanitary Sewer Phase 106 Rehabilitation
BID DATE
09/29/26 - 6:00
AGENCY
Clear Lake City Water Authority
ESTIMATE
n/a
SCOPE
Clear Lake City Water Authority. Project 24170-125-10114-000. In general, this work consists of: 1. Pre-television of lines to be repaired by point repair, service repair, combination point repair, service line reconnection, and/or cured-in-place pipe. 2. Raising of manholes to 1 inch above existing natural ground, as directed by Engineer. 3. Pipe bursting of sanitary lines including service reconnections in kind, remove and replace external drop stack removal and replacements, and cleanout replacements. 4. Rehabilitation of sanitary sewer lines by point repair, service repair, combination repair (including drop stack replacement), and mechanical cleaning. 5. Rehabilitation of sanitary sewer lines using the Cured-In-Place-Pipe (CIPP) method including external service reconnections in kind. 6. Rerouting sanitary sewer service lines as needed within the easement to reconnect existing services. All rerouted sanitary sewer service lines must be directed by the Engineer and may include situations such as service lines crossing outside the easement or routing service lines around various obstructions. 7. Television inspection of sewer lines after completion of rehabilitation work. 8. Trench safety as required per Section 01561, throughout the project. 9. Implementation, maintenance, and removal of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for street cuts and/or traffic control. 10. Site restoration including removal and replacement of damaged pavement including subgrade, curb and gutter, pavement markings as necessary and sidewalks, driveways, concrete patios, pools, wooden decks, irrigation lines, turf, plants, shrubs, fences, trees, damaged traffic signaling equipment and other miscellaneous items in the easement or right of way. 11. Any bypass pumping required to complete the work is incidental to the project. 12. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into sanitary sewer manholes in order for rehabilitation work to be performed. Bid opening September 29, 2026 at 1:00 PM America/Chicago. Pre-bid September 22, 2026 at 10:00 PM America/Chicago, mandatory. https://app.civcast.com/bid-opportunities/projects/6aa47305da3eb9403ea1f557/summary
PREBID
9/21/2026 5:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT