Access the Full Project by Clicking here!
Bidjugde
JOB
Glenbrook Tract Waterline Improvement and Residential Street Rehabilitation (REBID)
BID DATE
03/22/16 - 3:00
AGENCY
Brea
ESTIMATE
$2,700,000
SCOPE
ORGINAL BID RESULTS: MCC Pipeline - $2,437,750 Gentry Brothers - $2,613,805 Dominguez General Engineering - $2,843,145 Big Ben Construction - $3,139,909 Sully Miller Contracting Co. - $3,148,000 TBU Inc. - $3,149,939 Vido Samarzich - $3,161,716 Kana Pipeline (Kana Engineering) - $3,171,000 GRFCO Inc. - $3,264,840 Excel Paving (Palp) - $3,393,393 MNR Construction - $3,473,770 Paulus Engineering, Inc. - $3,498,661 Minco Construction (Minako) - $3,578,700 Griffith Company (GMB) - $3,651,156 Ramona - $3,829,752 This project consists of replacing approximately 12,650 linear feet of existing water mains with ductile iron pipe and the rehabilitation of the residential streets in the Glenbrook Tract. The project also to include the removal and replacement of existing damaged sidewalk, concrete curb and gutter, driveways, curb ramps and localized AC pavement, along with the adjustment of existing utilities to grade, construction survey, survey monument restoration, traffic signage and striping, traffic control, and all other miscellaneous improvements required to complete the project as shown on the plans, and as included in these specifications. Raul Lising raull@cityofbrea.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT