Access the Full Project by Clicking here!
Bidjugde
JOB
Us 90a Circle Drive/John Sharp Drive Utility Casings Cst2003
BID DATE
09/24/26 - 4:00
AGENCY
Sugar Land
ESTIMATE
n/a
SCOPE
City of Sugar Land 2026-ITB-043 US 90A at Circle Drive/John Sharp Drive Utility Casings CST2003 (OpenGov 296012). Install two 24-inch steel utility casings by trenchless methods at US 90A and John Sharp Drive/Owens Road intersection: approx. 360 LF casing for future water line and 303 LF casing for future wastewater force main; bore/receiving pits, capping/marking, utility coordination, traffic control, dewatering, restore disturbed areas. Carrier lines not in this contract. Released/posted Sep 2, 2026. Due Sep 24, 2026 11:00 AM CDT. Non-mandatory pre-proposal Sep 10, 2026 9:00 AM CDT (Teams). Free OpenGov project-document snapshot (Addendum #1 revision) attached as Specifications; full bid set/manual >40MB skipped. https://procurement.opengov.com/portal/sugarlandtx/projects/296012
PREBID
9/10/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT