Access the Full Project by Clicking here!
Bidjugde
JOB
Sierra Wash Erosion Mitigation Project at Glover Road
BID DATE
10/1/26 - 8:00
AGENCY
Oro Valley
ESTIMATE
n/a
SCOPE
Drainage infrastructure repair and rehabilitation: construct a concrete chute spillway at the outlet of an existing three-barrel 10-foot by 4-foot reinforced concrete box culvert, a gabion mattress apron, and rock-faced concrete slope protection at Sierra Wash. https://www.publicpurchase.com/gems/orovalley,az/bid/bidView?bidId=215762
PREBID
9/17/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT