Camino Martin Jeremy Place Reconstruction
BID DATE
02/26/16 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
Remove by milling 7,781 SY of asphaltic concrete to be salvaged to the Town, preparation of new base course of 4 inch new ABC and pave with 2 inch PAG 1 w/15 percent RAP and 2 inch virgin PAG 2. Construct new curbs and drainage facilities, adjust utilities, construct new asphalt driveways to the existing right of way, Stress Absorbing Membrane (SAM) rubber chip seal on Jeremy Place only and other incidental items. The Contractor shall coordinate with the Construction Manager on the salvaged millings which shall be delivered by the Contractor to the Public Works Operations and Maintenance Yard at 5100 W. Ina Road, Tucson, AZ 85743.