Access the Full Project by Clicking here!
Bidjugde
JOB
Constructed Recharge For Effluent Phase I
BID DATE
03/8/16 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
TOTAL INCLUDE ALT 1 & 2. ADDENDUM CHANGED BID DATE. UPDATED PLANHOLDER. The work under this contract shall consist of furnishing all labor, equipment, and materials required to construct an underground storage facility for tertiary effluent produced by the Marana Water Reclamation Facility, as permitted by the Arizona Department of Water Resources and the Arizona Department of Environmental Quality. The work includes, but is not necessarily limited to pipe installation; manhole, vault, and diversion structure installation; trenching, backfill, and grading; construction of maintenance roads with access gate through existing fencing; removal and replacement of agricultural irrigation system facilities; excavation and construction of recharge basins 20 feet below current land surface; construction of a topographic feature with a stream of cascading pools and falls, final grading and slope stabilization, construction of a small lift station for the stream feature, site restoration, quality control, and other related incidental work as shown on the associated plans and/or described in the specifications. prebid: Marana Operations Center, 5100 W. Ina Road, Tucson, AZ 85743 in the Palo Verde Room Patrick OKane (520) 382-2679 pokane@maranaaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT