Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) US 89 Flood Mitigation Governmental Tank Storm Drain Lateral System Pipeline Flood Area
BID DATE
09/30/26 - 7:00
AGENCY
Coconino County
ESTIMATE
$15,590,568
SCOPE
The general scope of work for the Project includes, but is not limited to, value engineering, cost estimating, utility coordination and relocations, berms, installation of a large storm drain system, integration with an existing very large pipe storm drain system, concrete structures (inlets at the storm drain system), roadside drainage, and may include guardrail, handrail, other safety measures, paving, driveway matchups, fencing and hydroseeding. The project may also involve replacing a crossing at Hwy. 89 or drainage improvements at the crossing so proposals should note experience working with ADOT. purchasing@coconino.az.gov
PREBID
9/10/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT