Access the Full Project by Clicking here!
Bidjugde
JOB
Central Millbrae Stormwater Utility Improvements Laurel Avenue Green Hills Drive
BID DATE
09/11/26 - 7:00
AGENCY
Millbrae
ESTIMATE
n/a
SCOPE
In general, the work to be performed consists of but is not limited to, the removal and replacement of existing storm drains and installation of new storm drains in sizes 18-inch and 24-inch, using trench and open cut construction methods, storm drain manhole installations, pavement trench repairs, potholing, PCC curb, gutter, sidewalk removal and replacement, storm drain inlet replacement and new construction, incidental striping/markers removal & replacement, traffic control, mobilization, and all other work as shown on the Plans. https://vendors.planetbids.com/portal/46991/bo/bo-detail/145584 amora@ci.millbrae.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT