El Dorado Nature Center Improvements (REBID)
BID DATE
05/25/16 - 10:00
AGENCY
Long Beach
ESTIMATE
$762,000
SCOPE
ORG BID RESULTS: Act 1 Construction Inc. - $824,740 Bitech Construction Co. - $959,046 Los Angeles Engineering - $1,019,242 World Wide Construction - $1,286,990 The Work to be done consists primarily of replacement of pedestrian bridge and abutments, enhancement of main entry and signage, construction of outdoor amphitheater, ADA accessible path/trail, interpretive signage, seal coat and striping of parking lot, grading, fencing and gates, storm drain and trench drain installation, hardscape, irrigation and landscape including 90-day maintenance period. Work also includes demolition of existing concrete and asphalt concrete pavement, clearing and grubbing, tree removals, demolition of existing bridge and other existing improvements and salvage of existing boulders and logs for use elsewhere in the project, site lighting, site furnishings and related site improvements. Bids are required for the entire Work. Pat Castro; Dee Dorband pat.castro@psomas.com ; dee.dorband@longbeach.gov
PREBID
2/22/2016 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT