Access the Full Project by Clicking here!
Bidjugde
JOB
Palm Avenue Water Pipeline Replacement
BID DATE
03/8/16 - 2:00
AGENCY
Redlands
ESTIMATE
$1,000,000
SCOPE
This project consists of water pipeline replacement at three intersection on Palm Avenue and the replacement of 1 and 2 existing water services at multiple locations throughout the City. The work shall consist of all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; furnishing and installing all pipe, fittings, and appurtenances; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Jason Montgomery - 909-798-7584 x5 jmontgomery@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT