Access the Full Project by Clicking here!
Bidjugde
JOB
Highway 55 Sidewalk Extension
BID DATE
09/25/26 - 7:00
AGENCY
Durham
ESTIMATE
n/a
SCOPE
Extend pedestrian connectivity from the Riddle Road trail south along the Circle K frontage on Highway 55. New sidewalk, a crosswalk, accessible pedestrian ramps, and pedestrian-activated push buttons. Closes an existing sidewalk gap for walking along Highway 55 and crossing at Riddle Road. Bid 27-1091 / Contract EGI-2025-01. Bid bond 5%. Licensed NC Chapter 87. Contract time 150 calendar days, 120 to substantial completion. Non-mandatory pre-bid 09/09/2026 2:00 PM at 101 City Hall Plaza Ste 3207 Durham NC 27701. https://www.durhamnc.gov/bids.aspx?bidID=2391
PREBID
9/9/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT