Access the Full Project by Clicking here!
Bidjugde
JOB
Southwest Quadrant CDBG Frontage Improvements
BID DATE
03/3/16 - 2:00
AGENCY
Turlock
ESTIMATE
$210,000
SCOPE
The work consists, in general, of: Removing existing facilities, installing curb, gutter, sidewalk, driveway and alley approaches, and access ramps, installing aggregate base, hot mix asphalt, and striping, installing a storm drain manhole, storm drain pipe, and catch basins, installing a fire hydrant and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. Technical Contact: Randall Jones Contact Email: rjones@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT