Access the Full Project by Clicking here!
Bidjugde
JOB
North End Wastewater System Expansion Canterbury Lift Station IPS Odor Control
BID DATE
09/23/26 - 9:00 LIVE!
AGENCY
Lake Havasu
ESTIMATE
n/a
SCOPE
This project consists of work occurring at two different sites. One worksite will be at the Canterbury Lift Station and involves the demolition/removal of existing control panel, existing pumps and piping, existing generator etc. and the installation of all new. There will be a temporary bypass required. The other worksite will be at the IPS Odor Control and involves demolition/removal of the existing odor control and installation of a new odor control system. LIVE: https://tinyurl.com/3f94b2ww
PREBID
9/3/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT