Rancho Parkway Zone C Recycle Water Pipeline
BID DATE
01/26/16 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$361,765
SCOPE
: The project includes all labor, materials, and equipment required to install 1,670 feet of 12-inch PVC pipe, 20 feet of 6-inch PVC pipe, main line valves, air vacuum valves, removal of existing backflow assembly and ancillary equipment, including but not limited to demolition, removal, potholing, trenching, paving repair, slurry seal, re-striping, and all other necessary work.