Access the Full Project by Clicking here!
Bidjugde
JOB
2016 Citywide Sidewalk Repair - Phase 1
BID DATE
02/23/16 - 2:00
AGENCY
Monterey
ESTIMATE
$600,000
SCOPE
The work, in general, consists of furnishing materials, labor and equipment for the construction of the 2016 Citywide Sidewalk Repair - Phase 1 project, in Monterey, California, in accordance with these plans and specifications. The work shall include, but not be limited to the removal and replacement of Portland Cement Concrete (PCC) Sidewalks and hot mix asphalt sidewalks, installing curb drains and installing tree wells with cobblestones. The City of MontereyÂ’s typical weather conditions and terrain include: cool, moist conditions, both flat and hilly terrain, and trees which contribute to shaded areas. The areas where construction will occur are located in high pedestrian traffic areas. Appropriate safeguards must be put in place to protect the public from injury and protect the placed product from vandalism prior to concrete curing. Rose Dickson City of Monterey Public Works/Engineering 353 Camino El Estero Monterey, CA 93940 Tel:(831) 646-3997 Fax:(831) 646-5686 dickson@monterey.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT