Access the Full Project by Clicking here!
Bidjugde
JOB
Trans Mains 1 2 Valve Replacement Phase 4
BID DATE
09/3/26 - 7:00
AGENCY
Alderwood Water and Wastewater District
ESTIMATE
$2,788,000
SCOPE
Installation of five (5) 30-inch District supplied butterfly valves and one (1) 36-inch District supplied butterfly valve with appurtenances. Removal of one (1) 2-inch ARV and replacement with a manual blow-off with vault structure at one site location, and reconnection of three (3) 4-inch combination ARV assemblies, at two site locations. Installation of one (1) 30-inch by 30-inch tee, four (4) 30-inch by 24-inch tees, one (1) 36- inch by 24-inch tee, one (1) 30-inch by 6-inch tee, one (1) cast-in-place concrete vault, and one (1) precast concrete access vault with appurtenances for pipe access. Removal, haul, and disposal of existing reinforced concrete slabs, steel sheets, vault top section, and replacement with new reinforced concrete slabs and steel sheets at one site. http://bxwa.com/bxwa_toc/pub/46/aw41_trans_mains_1_amp_2_valve_30974/info.php ZPurtill@awwd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT