Access the Full Project by Clicking here!
Bidjugde
JOB
Hillcrest Recovery Well
BID DATE
03/16/16 - 4:00 LIVE!
AGENCY
Chandler
ESTIMATE
$1,309,770
SCOPE
CHANGED TO LIVE. ADD 1 CHANGED DUE DATE....BIDS 3/15, OPEN 3/16. Work under this contract includes: installation of Hillcrest Recovery Well Equipment located at 5899 South Hillcrest Drive in Chandler, Arizona. Construction work includes a new vertical well pump with above ground motor, new electrical power supply, motor control system, instrumentation and controls, a backflow prevention assembly, and various diameter pipes, valves, and appurtenances. The recovery well will be connected to an existing reclaimed water distribution system. The project also has concrete pads, earthwork, site grading and drainage including an access road, retention basin, and drywell with interceptor, and perimeter concrete masonry wall with vehicular and man gates.
PREBID
2/16/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT