Access the Full Project by Clicking here!
Bidjugde
JOB
Pino Lane Wastewater Improvements
BID DATE
09/10/26 - 7:00
AGENCY
Austin Finance Online
ESTIMATE
$1,900,000
SCOPE
This project is to construct wastewater pipe in Pino Lane near E. William Cannon Dr. The new pipe will reroute flow from a manhole in Pino Lane south to another manhole in Dove Springs Road to alleviate the capacity bottleneck. The wastewater pipe near Pino Lane has a very high risk of overflows because the existing capacity is inadequate for current wastewater flows. The Work consists of installation of approximately 1,825 linear feet of new 6”, 8”, 15”, and 18” PVC wastewater line including bypass pumping, and new pre-cast and cast-in-place manholes. Additionally, the Work includes approximately 1,150 linear feet of Cured-In-Place Pipe (CIPP) lining on an existing 10” concrete wastewater line. Incidental work includes erosion and sedimentation control, pavement repair, stormwater pollution prevention plan (SWPPP), and traffic control during construction. https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=143996 tamira.konkin-garcia2@austintexas.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT