CDBG Funded Grind Overlay FY27
BID DATE
08/27/26 - 3:00
AGENCY
Glendora
ESTIMATE
n/a
SCOPE
Mobilization & De-Mobilization Traffic Control Grind & cold mill roadway to 2” depth Construction of 2" ARHM overlay. Work includes crack sealing. Adjust existing storm drain/sewer/utility manhole/vault frames and covers to finished grade. Adjust existing water/gas valve can and cover to finished grade. Restore and install traffic striping, markings, curb paintings. Remove and replace 4" PCC sidewalks per SPPWC std plan 113-2 Remove and reconstruct existing curb and gutter per SPPWC 120-3 to match existing; work shall include 1' wide x 8" deep AC Pavement slot cut and restore it with AC, type C2-PG 64-10, full depth. Re-establish survey monuments including tie-outs https://qcpi.questcdn.com/cdn/posting/?projType=all&provider=5645931&group=5645931 dhernandez@cityofglendora.org