Barbara Drive Drainage Phase 3 Lf 2022 Bond
BID DATE
09/5/26 - 5:30
AGENCY
San Antonio
ESTIMATE
$14,599,454
SCOPE
Upgrading existing underground storm drain system from 2- 9’x6’ culverts to 3-10’x9’ box culverts including roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. Additionally, El Montan Street will be reconstructed to restore street flow capacity and curb height, with sidewalks, driveways and other necessary items with available funding. Scope also includes SAWS water/sewer and CPS Gas relocations and surface adjustments. https://app.civcast.com/bid-opportunities/projects/6a68f79b6020a32872f0aa1d/summary sandra.figueroa@sanantonio.gov
PREBID
8/13/2026 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION