Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG 54th Street Water Main Improvement
BID DATE
09/17/26 - 4:00
AGENCY
Temple Terrace
ESTIMATE
n/a
SCOPE
CDBG N 54th Street Water Main Improvement Project generally involves the installation of a new 6-inch water main on 54th and 55th Street, connecting from the 6-inch main on East Mission Hills Avenue to new 6-inch water mains for both 54th and 55th Street. The project includes the installation of approximately 800 feet HDD of 6-inch fusible PVC water main, fittings, gate valves, fire hydrant assembly, cut-in-tee, disinfection, sampling, testing, and other appurtenances for a complete and operable system. Additionally, twelve new far side dual potable water services and twelve near side dual water services to be relocated and installed on private property to connect the residential customers to the new water main located in the front of the lots in the public right-of-way. https://www.demandstar.com/app/limited/bids/545570/details support.demandstar@eunasolutions.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT