Access the Full Project by Clicking here!
Bidjugde
JOB
Western Corridor Sanitary Sewer Improvements
BID DATE
09/23/26 - 3:00
AGENCY
Cumming
ESTIMATE
n/a
SCOPE
Major elements of work include, but are not limited to: construction of gravity sanitary sewer and sanitary sewer force mains; manholes, valves, and trenchless crossings; grading and site work; access drives; site utilities (both public and private); instrumentation and controls; electrical systems; fencing; installation of a JIB crane; construction of a new electrical building; installation of a diesel-fired emergency bypass pump; erosion and sedimentation control measures; and final site restoration and grading. The total length of new sewer infrastructure included in the Project is approximately 4,360 linear feet, consisting of approximately 2,860 linear feet of 12-inch, 10-inch, and 8-inch gravity sanitary sewer and approximately 1,500 linear feet of 8-inch sanitary sewer force main, including associated manholes, fittings, appurtenances, and system connections. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66895-NONST-2027-000000057&sourceSystemType=gpr20 jnjohns@garverusa.com
UPDATES