Access the Full Project by Clicking here!
Bidjugde
JOB
Lift Station No 8 10 Inch Force Main
BID DATE
08/26/26 - 5:30
AGENCY
Parkway Utility District
ESTIMATE
n/a
SCOPE
Construction of Lift Station No. 8 which includes, but not limited to, construction of a twelve-foot (12') diameter concrete wet well including coating system, well point system and dewatering as necessary, complete with three (3) submersible pumps, riser piping, valves, coatings, three (3) access hatches and safety grates, chain link fence and gates, site work, concrete access drive up to lift station boundary at Tidwell R.O.W., concrete pavement, 15-inch and 18-inch on-site sanitary sewer piping as necessary, sanitary sewer manholes, 10-inch on-site force main, water service line with meter and backflow preventer concrete pads, rack, hose bib, one (1) 100-kW diesel engine driven generator with 24-hour sub-base fuel tank, sound attenuated weatherproof level 2 enclosure, generator concrete pad, automatic transfer switch, load bank testing, lift station control panel, electrical service, disconnect switches, conduit, wire, lighting, all associated electrical work, laboratory services, and all else as shown on the construction drawings and detailed in the specifications and not specifically addressed in separate bid item, for a fully functioning facility, complete in place. Furnish and install 10-Inch (10") AWWA C-900 DR-18, Class 235 PVC (green) force main, all depths, open cut and trenchless with restrained joints as shown on the construction drawings (including fittings, tracer wire, bedding, backfill, and testing), complete in place. https://app.civcast.com/bid-opportunities/projects/6a6a8472d9774a9747c4b7c3/summary mmatula@quiddity.com
PREBID
8/12/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT