Winthrop Lake Dam Renovation
BID DATE
09/3/26 - 7:00
AGENCY
Winthrop University
ESTIMATE
n/a
SCOPE
The Work consists of alteration of an existing damincluding: reservoir drawdown and dewatering; site clearingand grubbing; removal of existing outlet works; construction of a new cast-in-place reinforced concrete combination service/emergency spillway structure (horseshoe configuration); installation of new 48-inch ductile iron pipe outlet works; hand-placed riprap outlet protection. As shown on Contract Drawings. Drawings and specified herein. will@armstrongglen.com