Access the Full Project by Clicking here!
Bidjugde
JOB
Lower Reedy Streambank Stabilization RFB
BID DATE
09/1/26 - 7:00
AGENCY
Greenville
ESTIMATE
n/a
SCOPE
The Lower Reedy WWRF Streambank Stabilization includes restoration and stabilization of an eroded section of streambank along the Reedy River adjacent to existing sanitary sewer infrastructure. Work includes removal of existing structures and debris, installation of approximately 194 LF of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Disturbed areas and newly constructed slopes will be revegetated to provide final stabilization and reduce the potential for future erosion. https://vendors.planetbids.com/portal/42823/bo/bo-detail/144733 stephanies@re-wa.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT