Access the Full Project by Clicking here!
Bidjugde
JOB
Legion Pond Dam
BID DATE
08/24/26 - 4:00
AGENCY
Chapel Hill
ESTIMATE
n/a
SCOPE
The project will first require dewatering of the existing pond. The dewatering intake will be from the surface of the pond as required by Dam Safety. The dewatering outlet will discharge onto a rock pad to dissipate energy and minimize any erosion. Upon completion of dewatering the principal outlet barrel will be used to convey daily water flows through the dam. The demolition of the dam and embankment will work from the top down mainlining the bypass flow through the principal outlet pipe as long as possible. A bypass pump will be set when the excavation gets to elevations requiring the existing pipe to be removed. It is anticipated that earth moving equipment will be used for the project including but not limited to excavators, loaders, and dump trucks. https://www.chapelhillnc.gov/Town-Government/Doing-Business-with-Chapel-Hill/Bids-Current/RFB-P27-04-Legion-Pond-Dam cbrown1@chapelhillnc.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT