Access the Full Project by Clicking here!
Bidjugde
JOB
City Hall Building
BID DATE
03/3/16 - 4:00
AGENCY
Somerton
ESTIMATE
$7,000,000
SCOPE
The project consists of the construction of approximately 15,000 s.f. Two-story, Type V-B sprinklered building. Construction materials include concrete masonry unit and steel framed walls, steel beam and metal deck floor/roof construction. Exterior walls are integral colored ground-face masonry and standing seam metal siding over metal framing and roof material is single-ply roofing over rigid insulation and metal deck. Ceramic Tile, ground concrete, carpeting, lay-in acoustical ceilings and various millwork items are some of the interior features. Site work includes site preparations, asphalt driveways, concrete sidewalks, landscape and irrigation.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT