Access the Full Project by Clicking here!
Bidjugde
JOB
La Quinta Retention Basin Upgrades
BID DATE
09/3/26 - 4:00
AGENCY
Yuma
ESTIMATE
n/a
SCOPE
Grading modifications to the existing retention basin including new catch basins and a new 18" storm drain system to connect to the new storm water lift station. The new storm water lift station will pump standing water from the existing retention basin at 29th Lane Linear Park to the existing large field on the adjacent property to the east, in order to improve the dissipation rate of the water via increased percolation rate and surface area for infiltration and evaporation in order to minimize and/or prevent standing water related nuisances https://yumaaz.bonfirehub.com/opportunities/246474
PREBID
8/18/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT