Access the Full Project by Clicking here!
Bidjugde
JOB
Barbara Drive Drainage Phase 3 LF
BID DATE
09/4/26 - 7:00
AGENCY
San Antonio
ESTIMATE
n/a
SCOPE
Upgrading existing underground storm drain system from 2- 9’x6’ culverts to 3-10’x9’ box culverts including roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. Additionally, El Montan Street will be reconstructed to restore street flow capacity and curb height, with sidewalks, driveways and other necessary items with available funding. Scope also includes SAWS water/sewer and CPS Gas relocations and surface adjustments. https://webapp1.sanantonio.gov/BidContractOpps/Content.aspx?id=6266&page=Default

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT