Access the Full Project by Clicking here!
Bidjugde
JOB
WD27003G Asphalt Concrete Cold Planing
BID DATE
09/2/26 - 8:00
AGENCY
Stockton
ESTIMATE
n/a
SCOPE
Contracts for asphalt concrete cold planing services to remove areas of failing or unsuitable asphalt concrete throughout the City. Asphalt concrete cold planing is the process of removing asphalt concrete with a milling machine in preparation for repair and repaving. The milling machine is equipped with a large drum and diamond tipped teeth, which removes a six-foot wide path of asphalt concrete to a pre-set depth and deposits the removed material onto a conveyor belt to transfer it to a truck for transport. Cold planing is a component of road repair and repaving work completed each year during the summer and early fall when the weather is typically favorable.https://www.stocktonca.gov/bid_detail_T22_R1144.php Chanel.Teach@stocktonca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT