Access the Full Project by Clicking here!
Bidjugde
JOB
2026 014 NP Golden Harbour Infrastructure Upgrades
BID DATE
08/27/26 - 8:00
AGENCY
Boca Raton
ESTIMATE
$2,000,000
SCOPE
The work (Project) includes furnishing all labor, materials, equipment, services, and incidentals to replace approximately 5,000 linear feet of water main ranging in sizes from 4” to 6” in the Golden Harbour neighborhood along NE 5th Ave between NE 14th St and NE 4th Ln. Included with the water main replacement is abandonment of existing water mains, installation and reconnection of meters as well as additional civil upgrades including roadway, sidewalk and stormwater collection improvements. Furnishing all labor, materials, equipment, services, and incidentals for all scope components are required for a complete and operating system. Maintenance of water service and coordination with operations are required. All work shall comply with Contract Documents and permit conditions, and include all ancillary components, testing and restoration work, as necessary. https://brpurch.ionwave.net/PublicDetail.aspx?bidID=3497&SourceType=1 NPHILLIPS@BOCARATON-FL.GOV

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT