Access the Full Project by Clicking here!
Bidjugde
JOB
IFB No 27 001 Construction Services Highway 99 Water Sewer Extension
BID DATE
09/1/26 - 5:00
AGENCY
Brunswick-Glynn County Joint Water & Sewer Commiss
ESTIMATE
n/a
SCOPE
requests utility contractors to submit bids for furnishing all skill, labor, materials (unless noted otherwise), tools, equipment and incidentals required to install 3,873 linear feet of 12¿ water main and 943 linear feet of 8¿ gravity sewer main. The project is located in the north mainland district in Glynn County, Brunswick, Georgia and requires crossing a high traffic GDOT roadway (Highway 99). Sealed bids will be received by the Brunswick-Glynn County Water and Sewer Commission at the Administrative Office located at, 1703 Gloucester Street, Brunswick, Georgia 31520 until 12:00 NOON EST on Tuesday, September 1, 2026, at which time and place they will be publicly opened and read aloud. 2.0 SCOPE OF WORK This project will require coordination with a private development project with those construction plans included as Exhibit A. The scope of work under the JWSC contract is: 1. Water Main: Installation of approximately 3,873 linear feet of 12-inch water main along Whiskey Road and Highway 99 from Shell Road, including: a. Approximately 2,629 linear feet of 12-inch water main along Whiskey Road to the end of the Delta Crossing plans, and; i. The scope shall be to install water main and associated appurtenances as shown in Exhibit B-1, B-2, and B-3. b. 1,244 linear feet of 12-inch water main from Phase 1 to the end of Whiskey Road. i. The scope shall be to install water main as shown in Exhibit B-4 and B-5. 2. Sewer Main: installation of approximately 943 linear feet of 8-inch gravity sewer main, including: a. 157 linear feet of 8-inch gravity sewer main along Highway 99, and; b. 786 linear feet off 8-inch gravity sewer main along Whiskey Road from Highway 99. c. The scope shall be to install gravity sewer main as shown in Exhibit B-6, B-7, and B-8. Owner will provide 12¿ water main materials and 8¿ gravity sewer main materials, except for 4 sanitary sewer manholes which will be the responsibility of the. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66315-NONST-2027-000000022&sourceSystemType=gpr20 cfree@bgjwsc.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT