Access the Full Project by Clicking here!
Bidjugde
JOB
Old Town Front Street Pavement and Storm Drain Rehab (REBID)
BID DATE
02/22/16 - 10:00
AGENCY
Temecula
ESTIMATE
$770,000
SCOPE
ORG BID RESULTS> Beador Construction Co. - $686,600 RJ Noble - $860,377 Hillcrest Construction - $883,466 All American Asphalt - $939,385 Hardy & Harper - $1,111,000•localized removal and reconstruction of existing pavement structural section, consisting of 0.50’ asphalt concrete over 1.23’ crushed aggregate base;•placement of slurry seal over entire project limits;•adjustment of various facilities to grade;•installation of traffic striping, pavement markings and legends;•construction of below-grade storm drain facilities including 24- and 30-inch HDPE pipe, and installation of a pre-packaged lift station;•construction of various surface drainage facilities including curb and gutter and concrete ribbon gutter;•appurtenant work not mentioned above but is required by the project plans and specifications. Judy McNabb - 951-694-6432, Jon Salazar - 951-308-6385 judy.mcnabb@cityoftemecula.org , jon.salazar@cityoftemecula.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT