JOB
Whitewater Sewer Crossing
BID DATE
08/28/26 - 4:00
AGENCY
Douglas
ESTIMATE
n/a
SCOPE
Underground and above ground installation of approximately 4,700 lf of sanitary sewer. The sanitary sewer system consists of 15" pvc sdr-35 and 15" welded steel pipe, beginning at the sr80 crossing approximately 600 ft west of copper avenue and terminates approximately 400 lf south of the sr80 along u.s. 191, tying into the chino road sanitary sewer system. The sanitary sewer system will be installed primarily by open trench along the state route 80 embankment within adot row. The sanitary sewer system will span the white water draw crossing via single span utility bridge, with abutments on either side of the draw and outside of the fema floodway.
PREBID
8/12/2026 3:00