Access the Full Project by Clicking here!
Bidjugde
JOB
24 Inch Peoria Waterline Slipline
BID DATE
08/18/26 - 9:00
AGENCY
Aurora
ESTIMATE
$3,800,000
SCOPE
The Design-Builder shall perform all design and construction services and provide all labor, equipment, and materials necessary for the 24 Inch Peoria Waterline Slipline Project. 2. The Work includes Design services (“Phase 1”) and construction services (“Phase 2”). Project schedules, rates, and scopes of work for Phase 1 shall be set forth in Attachments 5.1 and 5.3; and Project schedules and scopes of work for Phase 2 shall be set forth in Attachment 5.2, 5.4 and 5.5 using approved Work Packages. https://www.bidnetdirect.com/colorado/solicitations/open-bids/24-Inch-Peoria-Waterline-Slipline/0000431671?purchasingGroupId=8409951&origin=2 njones@auroragov.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT