Access the Full Project by Clicking here!
Bidjugde
JOB
South Boulevard 2745 Zone Reservoir Inlet Outlet Pipeline
BID DATE
08/25/26 - 4:00
AGENCY
Las Vegas VWD
ESTIMATE
$28,203,225
SCOPE
The project consists of installing approximately 18,000 linear feet of 42-inch-diameter mortar-lined, tape-wrapped, and mortar-coated steel pipe, including communications infrastructure consisting of fiber optic conduit, pull boxes, and necessary appurtenances along the length of the pipeline. The project will also include construction/installation of four 42-inch butterfly valves, with associated cast-in-place concrete vaults, a sacrificial anode cathodic protection system, and other water pipeline appurtenances. Additionally, the project will remove an existing 12-inch gate valve and replace it with a 12-inch butterfly valve located within an existing vault at the 2860 Zone South Pumping Station and Forebay. The project will also include electrical/communications improvements for the new valves. Purchasing.HelpDesk@lvvwd.com
PREBID
8/4/2026 4:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT