Access the Full Project by Clicking here!
Bidjugde
JOB
Encinal Canyon Road 60 Inch Storm Drain Repairs
BID DATE
07/30/26 - 8:30
AGENCY
Malibu
ESTIMATE
n/a
SCOPE
In general, the proposed improvements consists of furnishing and installing a 48-inch slip liner within an existing 60-inch corrugated metal pipe including: cleaning and preparing the host pipe, CCTV inspections, grouting the bottom of the host pipe, localized repair of constricted section of existing host pipe, annular space grouting, construction of inlet and outlet end seals and transitions, bypass pumping or flow control if required, and protection of existing facilities and restoration of disturbed areas and all other appurtenant work included and shown in the Contract Documents and Specifications. https://www.malibucity.org/bids.aspx?bidID=325 MPublicWorks@malibucity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT