Access the Full Project by Clicking here!
Bidjugde
JOB
Foxboro Pavement Rehabilitation Phase 1
BID DATE
08/11/26 - 7:00
AGENCY
Hercules
ESTIMATE
$780,000
SCOPE
In general, the work to be performed consists of mobilization, traffic control and construction signage, water pollution control, dust prevention and control, site cleanup, rubberized cape seal, crack seal, asphalt concrete removal, wedge grind, asphalt concrete installation, ADA ramp construction, PCC curb & gutter removal and replacement, PCC sidewalk removal and replacement, utility cover lowering & restoring to grade, survey monument reinstallation, striping and marking removal & replacement, and all other work as shown on the Plans, called for in the Technical Provisions and as directed by the Engineer. https://www.herculesca.gov/Home/Components/RFP/RFP/62/824

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT