Access the Full Project by Clicking here!
Bidjugde
JOB
Campbell Acres Water Sewer Improvements
BID DATE
08/25/26 - 7:00
AGENCY
Fort Myers
ESTIMATE
n/a
SCOPE
Water System Replacement. Replace existing water mains with new Ductile Iron and polyvinyl chloride (PVC) pipes, as specified. Install new service lines and valves. Sewer System Replacement. Rehabilitate existing sewer mains using UV Cured-in-Place lining (CIPL), as specified. Lining of existing manholes and service laterals. Conduct CCTV inspection of new sewer lines to ensure proper installation and functionality. Lift Station Rehabilitation. Mechanical and electrical rehabilitation of the existing lift station (LS-36) Utilize bypass pumping under high rainfall conditions. Site Restoration. Restore all disturbed areas to their original condition, including pavement, sidewalks, landscaping, and other surface features. Ensure proper compaction and grading to prevent future settlement issues. https://procurement.opengov.com/portal/cityftmyers/projects/272869

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT