Access the Full Project by Clicking here!
Bidjugde
JOB
Filter Feed Pump Station Rehabilitation Wastewater Treatment Plant
BID DATE
08/18/26 - 8:00
AGENCY
Hollywood
ESTIMATE
n/a
SCOPE
Conduct site evaluation walk-through to inspect and verify current pumps and check measurements for the equipment installation.Permit fees associated with above-mentioned work. Concrete demolition, replacement, and rehabilitation No substitutes will be accepted. Any unauthorized changes or deviations from this contract document will be made at the contractor’s sole expense. In such a case, the contractor will be required to provide the contractually specified item at no charge to the COH, unless prior written authorization has been granted by the COH. Submittal documents will be required for approval before the demolition/rehabilitation work begins. https://procurement.opengov.com/portal/hollywoodfl/projects/275633 jblanco@hollywoodfl.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT