Access the Full Project by Clicking here!
Bidjugde
JOB
2026 LMIG Roadway Improvements
BID DATE
08/6/26 - 7:00
AGENCY
Hoschton
ESTIMATE
n/a
SCOPE
The Project consists of, but is not limited to the following major elements: Approximately 480 Tons of 9.5 mm Asphalt Superpave, 286 Tons of Asphalt Patching, 4,300 SY of 12-inch Soil-Cement Stabilization (CSRB), 430 SY of 6-inch Graded Aggregate Base Course, 98 CY of Class B Concrete Base and Pavement Widening, 120 CY of Foundational Backfill Material, 340 LF of Header Curb, 30 LF of 24-inch RCP Storm Drain, 524 LF of 18-inch RCP Storm Drain, 35 LF of 15-inch RCP Storm Drain, 30 Drainage Structures, 3,200 LF of 5-inch White Thermoplastic Pavement Striping, 10,200 LF of 5-inch Yellow Thermoplastic Pavement Striping, 60 LF of 24-inch Thermoplastic Pavement Striping, Signage, Adjusting Structures to Grade, Shoulder Reconstruction, Traffic and Erosion Control Measures. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66213-NONST-2027-000000019&sourceSystemType=gpr20 jkidd@cityofhoschton.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT