Access the Full Project by Clicking here!
Bidjugde
JOB
2026 IFB 324 Union Grove Road Stormwater Improvement
BID DATE
08/19/26 - 7:00
AGENCY
Douglasville Douglas County Water & Sewer Authority
ESTIMATE
n/a
SCOPE
The scope of work includes the provision by the bidder or contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be ¿turnkey¿ and require minimal involvement of Authority personnel. The Project consists of furnishing all labor, materials, equipment, and incidentals necessary to complete the Union Grove Road Stormwater Improvement Project, including, but not limited to, the removal and disposal of approximately 46 linear feet (LF) of 36-inch corrugated metal pipe (CMP), 33 LF of 30-inch reinforced concrete pipe (RCP), an existing concrete headwall, roadway pavement, a portion of an existing driveway, trees, and approximately 59 LF of existing water main for relocation and replacement. The work also includes the installation of approximately 57 LF of 8-foot by 3-foot and 40 LF of 12-foot by 3-foot reinforced concrete box culverts, concrete headwalls and aprons, roadway reconstruction, relocation and replacement of the water main with 8-inch ductile iron pipe (DIP) installed within 16-inch steel casing, traffic control, erosion and sedimentation control, dewatering as required, testing, restoration, final stabilization, and all other appurtenant work necessary to complete the Project in accordance with the Contract Documents. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-77017-NONST-2027-000000057&sourceSystemType=gpr20 . jmorency@ddcwsa.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT