Access the Full Project by Clicking here!
Bidjugde
JOB
2026 14 Industrial Blvd Sewer Extension
BID DATE
08/27/26 - 3:00
AGENCY
Covington GA
ESTIMATE
n/a
SCOPE
This project consists of the installation of approximately 1,165 linear feet of new 8-inch sanitary sewer, including open-cut PVC and ductile iron pipe, as well as a directional drill crossing utilizing 8-inch HDPE. Work includes construction of new sanitary sewer manholes, connections to the existing sewer system, bypass pumping, adjustment of an existing manhole to grade, and installation of associated fittings and appurtenances. The project also includes abandonment of existing sewer infrastructure, modification of existing manholes and inverts, roadway restoration, traffic control, and implementation of erosion and sedimentation control measures. All disturbed areas shall be restored and permanently stabilized upon completion of construction. The time allotted for substantial completion of the work is 120 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 150 consecutive calendar days from the Notice to Proceed. https://www.cityofcovington.org/index.php?section=business-opportunities&docid=444 william.jones@gwesllc.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT